Willow/Palm Pedestrian Corridor Transit Connector Project
In general, the work to be performed consists of mobilization, traffic control and construction signage, water pollution control, dust prevention and control, site cleanup, PCC sidewalk installation, asphalt concrete removal, asphalt concrete installation, AC conform, AC base repair, subgrade preparation, ADA ramp construction, AC berm removal, PCC curn & gutter removal, PCC curb & gutter installation, slurry seal surfacing, landscape removal, landscape conform, streelights installation, storm drain inlets and pipe installation, driveway reinstallation, striping and marking removal & replacement, street sign installation, and all other work as shown on the Plans, called for in the Technical Provisions and as directed by the Engineer.
Status
Bidding Closed
Bid Date | 3/21/23 2:00pm |
Company
City of Hercules
Location
The Project is located at Willow Avenue and Palm Avenue in front of Hercules Transit Center, in the City of Hercules.
BIDS DUE BY: TUESDAY, MARCH 21ST, 2023 @ 2:00 PM